News Date and Time
Apr 30 2011 11:32
Download our Integration of the JobScheduler in a TWS environment case study (opens in a new browser window).
The study describes the complete replacement of Control-M by the JobScheduler, with the JobScheduler controlling jobs being run by TWS. The migration was carried out with low overheads and has significantly reduced the operator's ongoing scheduling costs.