Skip navigation.
  • Main Menu
  • JobScheduler Worldwide

Subscribe to our news as an RSS feed

Product Development News : Control-M to JobScheduler Migration Case Study

Posted by aa on 2012/4/30 11:41:52 (962 reads)

Download our integration of the JobScheduler in a TWS environment case study (opens in a new browser window).

The study describes the complete replacement of Control-M by the JobScheduler, with the JobScheduler controlling jobs being run by TWS. The migration was carried out with low overheads and has significantly reduced the operator's ongoing scheduling costs.

Mail this article to a colleague Send this Story to a Friend